Montgomery Passive House Tour

Loading Map....

Date/Time
Date(s) - 23/Sep
10:00 am - 12:00 pm

Location
Montgomery Passive House

Categories


Come on September 23 to see this Passive House!

The House with secondary suite was completed in the fall of 2016 after 2 years of design and construction. It is the first Passive House project in Calgary. The owners, both engineers, took the Passive House Designer Course and did much of the design and build themselves. The lot was chosen with Passive House in mind, and has excellent south exposure which can be hard to find on residential lots in Calgary.

The basement slab and walls are wrapped in 8” of EPS foam. The concrete floor and walls were left exposed on the inside to maximize access to the thermal mass. For the main level and loft, a 2×6 wall with additional exterior rock wool insulation was chosen to more closely resemble conventional wall construction. This was done partially to make it easier to get permits, pass city inspections, and find a framer. Two separate Zehnder ComfoAir Energy Recovery Ventilators provide ventilation to the suite and upper levels. A natural gas on demand hot water heater provides domestic hot water and feeds hydronic coils in the supply air streams to temper the air. Electric resistance heaters provide the rest of the heat. Klearwall Passive House Certified windows are used throughout.

The simple geometry and bold colours were inspired by homes in Iceland. A metal roof was chosen for durability and to reduce contamination of water collected for irrigation. The small building footprint relative to the lot size maximizes the space left for a food forest and annual garden.

A 26 panel 7.2KW solar photovoltaic system is being installed this fall to take advantage of the current government rebate.

We look forward to seeing you in September!

 

 

Bookings

Bookings are closed for this event.